extraordinary flow
Iguazú National Park on the Argentine side is open. The Upper and Lower Circuits, Green Trail and Ecological Train are operating. Gran Aventura and Travesía Iguazú are operating. Devil’s Throat remains closed; check access to the Macuco Trail. The Ecological Boat Ride is not operating. Iguaçu National Park on the Brazilian side is also open.














